This guide walks through the arithmetic in plain steps. It uses illustrative numbers only, because real figures always come from the turbine manufacturer’s performance data for the actual site conditions, but the method is the same for every trailer-mounted aeroderivative package.
Start with heat rate, not efficiency
Heat rate is the fuel energy needed to produce one unit of electricity, usually stated in Btu per kWh or kJ per kWh. Efficiency and heat rate describe the same thing: 3,412 Btu equals one kWh, so a heat rate of 10,000 Btu/kWh corresponds to about 34 percent efficiency. Mobile aeroderivative packages tend to sit in roughly that region at full load in simple cycle, with the exact value set by model, ambient conditions and site losses.
Always check which heating value the datasheet uses. Turbine makers normally quote heat rate on the lower heating value (LHV), while gas is usually bought and metered on the higher heating value (HHV). For pipeline natural gas the HHV is around 10 percent higher than the LHV, so mixing the two creates an error of that size in the fuel estimate.
Converting megawatts into gas flow
The basic calculation multiplies electrical output by heat rate. Take an illustrative 30 MW unit at 10,000 Btu/kWh LHV. Fuel input is 30,000 kW times 10,000 Btu/kWh, or 300 million Btu per hour on an LHV basis. Converting to HHV at about 1.1 gives roughly 330 MMBtu/h.
Pipeline gas often carries around 1,020 to 1,040 Btu per standard cubic foot on an HHV basis, so 330 MMBtu/h is in the order of 320,000 standard cubic feet per hour, or close to 7.7 million standard cubic feet per day for one unit at full load. A fleet of four such units would need about four times that. In metric terms the same method works with kJ/kWh and the gas calorific value in MJ per normal cubic metre.
Part load, hot days and starts
Mobile turbines rarely run flat out around the clock. At part load the heat rate rises, so fuel per MWh goes up even as total fuel falls. Running three units at 60 percent load usually burns more fuel per MWh than running two near full load, which is why fleet dispatch has a direct effect on the gas bill.
Ambient temperature matters as well. On hot days output drops and heat rate worsens, as covered in our note on hot-ambient derate. Starts, purges and idle running also consume fuel without producing much power. For a fleet that cycles daily, add an allowance for these periods rather than assuming steady full-load operation.
A simple way to capture these effects is to build a small table: expected load points across the day, the heat rate at each point from the manufacturer’s curves, and the hours spent at each. Summing fuel for each row gives a daily figure that is far more realistic than a single full-load number, and it shows which dispatch choices save the most gas.
Supply pressure and booster compressors
Volume is only half the gas question. Aeroderivative turbines typically need fuel at a pressure well above that of many local distribution networks, often several hundred psig at the package inlet. If the site supply is lower, a fuel gas booster compressor is needed, and its own power demand, redundancy and maintenance become part of the project.
The supply line, regulator station and filters must hold that pressure at peak flow, not just at average flow. Sudden load steps on a data center bridge fleet can pull gas faster than a long, small-bore lateral can refill, so the pressure drop at maximum flow should be checked with the utility or pipeline operator. Our page on fuel skid connections describes the hardware at the turbine end.
Liquid fuel backup volumes
Many trailer-mounted units can run on diesel as well as gas, which is useful when the gas connection is late or interruptible. The same arithmetic applies. Using an illustrative LHV for diesel of about 128,000 Btu per US gallon, a 30 MW unit at 10,500 Btu/kWh LHV on liquid fuel needs roughly 315 MMBtu/h, or close to 2,460 gallons per hour.
Multiply by run hours and number of units and the tank farm and truck deliveries quickly become a major site activity, which is why fuel logistics planning is a separate workstream. Liquid fuel operation can also affect emissions limits and maintenance intervals, so the permit and the service plan should both reflect the expected hours on diesel.
Turning the estimate into a fuel plan
A practical fuel plan lists the expected dispatch profile, the heat rate at each load point and ambient band, the resulting hourly and daily fuel demand, peak instantaneous flow, required supply pressure and any liquid fuel reserve. It should be shared with the gas supplier early, since contract quantities and capacity charges often depend on peak flow rather than annual volume.
For data center campuses the fuel plan should also look ahead. If the mobile fleet is a bridge to permanent plant, such as the New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA with slots from 2028 to 2030, the gas lateral and metering can be sized once for the final plant. Comparing fuel use against engines is covered in our article on turbines versus reciprocating engines.
About the authors
This guide comes from the USP&E fuel systems specialists who size gas and diesel supply for turbine fleets. USP&E is an EPC and O&M contractor, not a broker, with 150+ power projects in 45+ countries, 25,000 MW contracted since 2002 and 24+ years in the field. When a bridge fleet turns into a permanent station, the EPC side of our work takes over the design and build.
Offices: Colorado Springs (1755 Telstar Dr, Suite 300), Knoxville (800 S Gay St, Suite 700), London (162-168 Regent Street), Johannesburg (22 Kildoon Rd, Bryanston), Cape Town (31 Brickfield Road, Woodstock) and China (No. 1 Ningzhou Road, Wuxi). Regions: USA | AFRICA | UK | UAE | CHINA. ISO 9001 and ISO 45001 certified.
Mobile turbine fuel questions
How do you calculate gas turbine fuel consumption?
Multiply output in kW by heat rate in Btu/kWh to get fuel input per hour, then divide by the gas heating value to get volume.
Why does LHV versus HHV matter?
Turbine heat rates are usually quoted on LHV and gas is sold on HHV. For natural gas the difference is about 10 percent, enough to undersize a supply.
Does part-load running save fuel?
It reduces total fuel but raises fuel per MWh, because heat rate worsens as load falls.
What gas pressure does a mobile turbine need?
Aeroderivative packages usually need several hundred psig at the inlet. The datasheet gives the exact range, and low site pressure means a booster compressor.
Can a mobile gas turbine run on diesel?
Many dual-fuel packages can. Fuel volume, storage, emissions limits and maintenance intervals all need checking for the expected liquid fuel hours.
What should go to the gas supplier first?
Peak hourly flow, daily volume, required delivery pressure and the expected dispatch profile.
Check your fuel numbers
Send your load profile, site conditions and gas supply details, and our engineers will work through fuel demand, pressure and backup fuel for a mobile turbine fleet.
Phone +27 10 822 2324 during office hours, or write to info@uspeglobal.com at any time; the fuel planning request also routes straight to our project engineers. Trailer-mounted and packaged units can be browsed in our gas turbine stock list.
No responses yet