Your mobile gas turbine fleet is built to move, but every new site starts with the same question: will the trailer sit level and stay level? Jack points, soil bearing and shim packs decide whether the unit runs smoothly or shakes itself toward a trip.

If leveling is improvised on arrival, the risk is soft soil that settles under load, misalignment that raises vibration and oil levels that read wrong. The unit trips during commissioning, the crew waits for gravel and a crane, and your customer’s power is delayed by days.

USP&E as Your Guide for Mobile Turbine Sites

Confirm your access route before the unit ships. Bridges, turning circles, overhead lines and ground bearing at the pad all affect whether a trailer-mounted turbine arrives on time, and a late route survey can leave your power sitting at the gate.

Prepare the Pad Before the Trailer Moves

Cranes, filter change-outs, and trailer pull-out paths need corridors that survive mud season. If a unit cannot leave without tearing cables, the farm is not mobile in practice.

Write your leak-test and purging procedure in advance, approved by your gas supplier and site safety team. Include test pressures, hold times, gas detection and who signs off. When the trailer arrives, connection becomes a rehearsed sequence rather than a negotiation.

Write a Leveling Pack That Travels With the Fleet

Frame-class mobile bridges fail more often on escort permits, crane charts, and fuel letters than on compressor maps. Treat logistics as an engineering workstream with the same Extreme Ownership as paralleling. Noise and air pathways still apply when a package is called mobile — envelopes belong in the bridge schedule, not as afterthoughts. Related: noise and emissions envelopes and emissions permitting.

Wrong early freezes force every extension or conversion to renegotiate BOP. Ambiguous ownership of shared fuel headers and switchgear is how temporary CapEx becomes stranded concrete — related mobile vs permanent BOP.

Bridge Capacity and Compute Horizons

A remanufactured GE Frame 6B can follow a mobile deployment when your site needs continuous firm megawatts beyond trailer-sized units. Check records, inspection scope and transport needs, and compare used or new gas turbines for how quickly each can be placed on a prepared foundation.

Walk the route from the highway to the pad with the transport plan in hand. Turning radii, bridge limits and overhead lines can stop a trailer convoy, and finding that out on arrival day is the most expensive way to learn.

Track record

150+

power projects in 45+ countries

25,000 MW

contracted since 2002

400+

engineers and project managers

Your path from first call to reliable power

Washed-out bridges, weight limits, and airport vs road vs barge access change package choice. Trailer-mounted units that fit inland may fail coastal or mountain corridors. Related: barge and coastal mobile power.

  1. Map mobile GT loads, pad sites, soil and jack constraints, and which duties need grid-tie versus island leveling packs.
  2. Write leveling procedures, jack schedules, relocatable logistics, training, and O&M with named roles.

Common questions

Why design a trailer leveling pack before mobilisation?

USP&E designs the leveling pack first because a mobile turbine that sits unevenly runs with higher vibration and misleading oil level readings. Soft soil or missing shims found on arrival delay commissioning, cause trips and cost your customer days of power they were promised.

What soil information does a mobile turbine pad need?

USP&E asks for bearing capacity, water table, drainage and any fill or soft layers at each site. That data decides between compacted gravel and concrete pads under jack points, and it accounts for crane outriggers as well as the trailer, fuel skid and control module.

Can a remanufactured GE Frame 6B follow a mobile deployment?

USP&E can place a remanufactured GE Frame 6B on a permanent foundation once a site needs more continuous capacity than trailers provide. The unit is judged on records, inspection scope and transport needs, and the mobile units can stay on until it is commissioned.

How fast can USP&E respond to a mobile deployment request?

USP&E can begin as soon as you share the site location, soil information, load and deployment window. A first pad and logistics review follows quickly, and mobilisation timing then depends on unit availability, permits, fuel supply and the transport routes to your site.

What should O&M cover for mobile leveling packs?

USP&E includes level checks after the first heat cycle and at set intervals, vibration trending, jack and shim inspections, pad drainage checks and kit inventory in mobile O&M. Each check has a named role, so problems are caught before they cause a trip.

Why owners choose USP&E

150+Power projects in 45+ countries
25,000 MWContracted since 2002
ISO9001 & 45001 certified

USP&E is a full-service engineering, EPC and O&M company, not a broker. One team designs, builds and runs your plant, so nothing falls between contracts.

Racing a go-live date?

Tell us your load, fuel and timeline. A USP&E engineer will come back with options for Mobile Gas Turbine Generators projects, not a sales pitch.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Mobile Gas Turbine Generators is part of USP&E