Mobile Gas Turbine Generators

Trailer-mounted gas turbines for mining camps

How remote mines and contractor camps energise early production with relocatable, trailerised gas turbine packages — then redeploy or demobilise when the pit, plant, or camp moves.

What “trailer-mounted” means on a mine site

Camp load profiles that fit mobile GT

  • Early production and pre-strip power before the permanent plant is financed
  • Camp HVAC, water treatment, workshops, and contractor villages
  • Peak shaving beside diesel or HFO recip fleets during wet-season logistics constraints
  • Bridge power while a larger EPC plant is under construction

When diesel still belongs in the picture

Site readiness that decides first-fire date

  1. Pad and access — Trailer approach, crane radius, and bearing capacity for the heaviest module.
  2. Fuel path — Pipeline gas, CNG/LNG logistics, or liquid backup with clear changeover philosophy.
  3. Electrical interface — Voltage, frequency (50 Hz or 60 Hz), synchronisation, and island-mode protection for camp grids.
  4. Acoustic and HSE envelope — Distance to accommodation, dust, heat, and permit conditions in frontier jurisdictions.
  5. Redeployment plan — Will foundations and BOP allow a clean demobilisation when the camp shrinks?

Trust checks mining buyers should run

  • FCPA and OFAC compliance for internationally funded projects

Practical next steps for camp power

  1. Define camp MW, frequency, fuel, and first-power date against the mining schedule.
  2. SEARCH INVENTORY for mobile/modular turbines and any diesel contingency.
  3. Ask USP&E to scope EPC mobilisation and optional O&M — contact USP&E.
  4. Model demobilisation and residual value before the camp expands, not after it shrinks.

Related on this site: Bridge power during EPC · Demobilisation economics · EPC & O&M.

Common questions

Are trailer-mounted turbines only for short campaigns?

No. Many run multi-year camp or early-production duty, then relocate when the ore body or contract moves.

Why owners choose USP&E

150+Power projects in 45+ countries
25,000 MWContracted since 2002
ISO9001 & 45001 certified

USP&E is a full-service engineering, EPC and O&M company, not a broker. One team designs, builds and runs your plant, so nothing falls between contracts.

Racing a go-live date?

Tell us your load, fuel and timeline. A USP&E engineer will come back with options for Mobile Gas Turbine Generators projects, not a sales pitch.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · Mobile Gas Turbine Generators is part of USP&E